We have sloc to sloc STO setup. However I see that the PDT at the plant level is taken into account to calculate the delivery date in the receiving storage location. I don't want the PDT from the plant to be taken into account. Any idea how this could be accomplished. The PDT at the plant level is too large for sloc to sloc transit time which is usually 1 day. I have tried playing around with shipment scheduling and setting up routes and keeping transit times there but to no avail.
Also I want sloc to sloc to not ask for a source list but have std POs require a source list. How can I have the UB PO not require source list.
Thanks